UAE

'coolant applied'

Items tagged with 'coolant applied'

product image
Shaft Rotor Shaft Assembly

Shaft Rotor Shaft Assembly Shaft & Rotor Assembly machine This new semi-automatic machine will be used for Pressing the shaft into rotor as per requirement and spot facing, center drilling, drilling, reaming, cleaning the hole and pin pressing into hole the process sequence of this requirement • Shaft pressing into Rotor – The operator loads the rotor and shaft, and after part detection, pressing begins, with load confirmation displayed. • Shaft rotor height checking gauge – The operator checks the part's height, and the machine confirms with a green light. • Part loading at SPM – The operator loads the part, and after orientation and mix-up checks, the machine indexes to the next station. • Spot facing Operation – The tool performs spot facing under servo control, coolant is applied, and a sensor checks tool condition. • Center Drilling Operation – The center drilling tool operates under servo control, with coolant applied and tool condition monitored. • Drilling Operation – Drilling is servo-controlled with coolant, and a sensor checks tool condition after each cycle. • Reaming Operation – Reaming is servo-controlled with coolant, and tool condition is checked by a sensor after each cycle. • Cleaning of hole – Air pipes clean the reamed hole by blowing out chips and coolant. • Pin Pressing – The pin is pressed into the hole, with load monitoring, and the part moves to the next station after confirmation. • Pin height checking and unloading – Pin height is checked, and the part is unloaded using a pneumatic magnet after confirmation.

Send Message
product image
Heat Sink Assembly Machine

Heat Sink Assembly Machine Welcome to Iyalia engineering. This is Heat sink assembly machine with I C. We need to put all part automatically including screwing it. Only I C has to be fed manually, because its a dedicated part and can be damaged. Heat sink and the Screws are fed from Bowl Feeder. First one screw is assembled and then Conductive material is applied. IC is placed manually and once again both the screws are tightened. Then the finished Heat sink is taken out of machine.

Send Message

Still searching for
coolant applied?